Conference Proceedings
The Australasian Ground Control Conference An ISRM Regional Symposium (AusRock Conference) 2022
Conference Proceedings
The Australasian Ground Control Conference An ISRM Regional Symposium (AusRock Conference) 2022
Friction bolt performance over the past ten years in Australian mines
The load capacity of a friction bolt has long been regarded as 4 t/m of embedment for ground support design analysis and supported by in situ pull test results. In recent years, the authors have observed lower pull test results or inconsistent results which were rarely sighted in the early 2000s. The lower pull test results indicated in some cases that reliable friction bolt capacity (≥90 per cent of results) is closer to 3 t/m of embedment with some geotechnical engineers adjusting the ground support parameters in the design work accordingly.
Contributor(s):
D J Reardon, T M Nester, B J Barsanti and A N Page
-
Friction bolt performance over the past ten years in Australian minesPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2022
- Pages: 18
- PDF Size: 1.272 Mb.
- Unique ID: P-02409-Q2W2N8