Skip to main content
Conference Proceedings

The Australasian Ground Control Conference An ISRM Regional Symposium (AusRock Conference) 2022

Conference Proceedings

The Australasian Ground Control Conference An ISRM Regional Symposium (AusRock Conference) 2022

Add to cart

Friction bolt performance over the past ten years in Australian mines

The load capacity of a friction bolt has long been regarded as 4 t/m of embedment for ground support design analysis and supported by in situ pull test results. In recent years, the authors have observed lower pull test results or inconsistent results which were rarely sighted in the early 2000s. The lower pull test results indicated in some cases that reliable friction bolt capacity (≥90 per cent of results) is closer to 3 t/m of embedment with some geotechnical engineers adjusting the ground support parameters in the design work accordingly.
Return to parent product
  • Friction bolt performance over the past ten years in Australian mines
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2022
  • Pages: 18
  • PDF Size: 1.272 Mb.
  • Unique ID: P-02409-Q2W2N8

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.