Skip to main content
Conference Proceedings

The Australasian Ground Control Conference An ISRM Regional Symposium (AusRock Conference) 2022

Conference Proceedings

The Australasian Ground Control Conference An ISRM Regional Symposium (AusRock Conference) 2022

Add to cart

Use of fly-ash slurry in backfill grouting in coalmines

In backfill grouting for underground coalmines, the filling materials strengthen the caving rock and support the overlying strata to reduce surface subsidence. The broken roof strata fail and collapse during mining operations without appropriate supporting measures being taken. It is difficult to perform continuous backfill mining on the working face of such roofs using the existing mining technology. Therefore, in order to solve the above problems, fly ash and mine water are considered as filling materials, and flow characteristics of fly-ash slurry are investigated through laboratory experiments and theoretical analyses. Laws governing the diffusion of fly-ash slurry in the void of caving rock masses and in the void between a caving rock mass and a basic roof are obtained and verified. Based on the results obtained from the above analyses and field conditions at the Zhaoguan coalmine, Shandong Province, China, a cave backfill grouting system of the hauling pipeline is developed and successfully tested at the 1703 working face. The results demonstrate that a filling rate of 43.46 per cent is achieved, and the surface subsidence coefficient of the grouting process is found to be 0.475. Compared to the total caving method, the proposed system is found to achieve a reduction rate of 40.63 per cent. This effectively helps in lowering the value of the surface subsidence coefficient. Fly ash and mine water, considered as primary materials in this study, also play a significant role in improving the air quality and water environment.
Return to parent product
  • Use of fly-ash slurry in backfill grouting in coalmines
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2022
  • Pages: 1
  • PDF Size: 0.097 Mb.
  • Unique ID: P-02436-J4J1N5

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.