Skip to main content
Conference Proceedings

11th AusIMM Mill Operators' Conference 2012

Conference Proceedings

11th AusIMM Mill Operators' Conference 2012

PDF Add to cart

Statistical Plant Trials - Efficiently Combining Concentrate Grade and Metal Recovery Results

Statistical metallurgical plant trials are becoming more widespread, as a valuable tool for increasing plant profitability. Generally, a single parameter like metal recovery varies under the trial condition while all other variables such as average metal feed grade or average metal concentrate grade are equal for the two test conditions during the period of the test. Metal recovery is usually the measured variable because concentrate grade is fixed by smelter terms, and plants operate to maximise recovery at the required concentrate grade. However, in all flotation plants there is a relationship between concentrate grade and metal recovery, and under the same conditions increasing one results in a decrease in the other. At MMG's Rosebery Mine the zinc concentrate produced is generally above smelter specifications, so zinc concentrate grade can vary during a test. During trialling of magnetic conditioning in the Rosebery zinc circuit, the difference in both zinc recovery and zinc concentrate grade were analysed. The analysis of changes in zinc grade and recovery during the trial raised some interesting questions about the relationship between concentrate grade and recovery. A paired statistical method was developed and tested to combine in each pair the change in concentrate grade and recovery in a single result that could be analysed by a paired t test. This method was found to be very sensitive to combined, varying changes in concentrate grade and/or metal recovery. It was also evaluated on plant test results from another flotation plant to verify its applicability in other plants. CITATION:Long, G, Taylor, S and Lumsden, B, 2012._x000D_
Statistical plant trials - Efficiently combining concentrate grade and metal recovery results, in Proceedings 11th AusIMM Mill Operators' Conference, pp 355-362 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Statistical Plant Trials - Efficiently Combining Concentrate Grade and Metal Recovery Results
    PDF
    This product is exclusive to Digital library subscription
  • Statistical Plant Trials - Efficiently Combining Concentrate Grade and Metal Recovery Results
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 0.223 Mb.
  • Unique ID: P201210046

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.