Skip to main content
Conference Proceedings

11th AusIMM Mill Operators' Conference 2012

Conference Proceedings

11th AusIMM Mill Operators' Conference 2012

PDF Add to cart

Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite Concentrates

The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines with differing mineralogy. The flotation circuit of each train was designed to operate in several modes depending on the feed mineralogy. The majority of ore mined at Telfer is processed in a sequential mode where copper minerals are first floated into a saleable copper concentrate followed by the flotation of an auriferous pyrite concentrate which is treated in an on-site hydrometallurgical plant (carbon-in-leach (CIL)). Gold is recovered as a gravity product within the primary grinding circuit, to the copper concentrate, and to a lesser extent, the CIL circuit.Since Telfer was re-opened, with a new concentrator, in 2004, the processing plant has struggled with poor copper concentrate grades, partially due to the excessive entrainment of non-sulfide gangue minerals in the copper flotation circuit and, more recently, due to composite copper particles produced when processing ore from a supplementary satellite pit that has not previously been processed through the new Telfer concentrator. Gold recoveries in the CIL circuit have also been below industry standard. This paper presents the implementation of recent changes made to the circuit to address these performance issues. The reconfiguration of the circuit has involved the installation of the following major equipment items: two ISAMills in ultra-fine grinding applications (one in the copper circuit and one in the pyrite circuit), two Jameson Cells to improve fine gangue rejection and a bank of 5_x000D_
Outotec TC30s to recovery copper and gold from the reground pyrite stream. The equipment was purchased direct from vendors and an engineering firm contracted to design and install the multi-vendor reconfiguration upgrade.CITATION:Seaman, D R, Burns, F, Adamson, B, Seaman, B A and Manton, P, 2012. Telfer processing plant upgrade - The implementation of additional cleaning capacity and the regrinding of copper and pyrite concentrates, in Proceedings 11th AusIMM Mill Operators' Conference, pp 373-382 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite Concentrates
    PDF
    This product is exclusive to Digital library subscription
  • Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite Concentrates
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 0.584 Mb.
  • Unique ID: P201210049

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.