Conference Proceedings
11th AusIMM Underground Operators' Conference
Conference Proceedings
11th AusIMM Underground Operators' Conference
A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective
The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nourishment to the creative thinking of designers of skip loading facilities for hoisting systems. Early systems were as simple as manual loading which evolved into a surge bin feeding a skip through a chute finally maturing into a measuring flask discharging into a chute to feed the skip and more recently high capacity skip feed conveyors. This paper will compare the concepts of the skip loading flask and the skip loading conveyor systems over a range of winding distances and hoisted tonnages. The comparison will draw on actual installations and review operational, maintenance and safety. An order of magnitude capital cost estimate will be used to complete the financial comparison. This will enable the reader to understand the concepts and costs and assist in selecting the appropriate skip loading system._x000D_
FORMAL CITATION:Northcote, A E A, 2011. A comparison of skip loading systems from an operational, maintenance, safety and capital cost estimate perspective, in Proceedings 11th AusIMM Underground Operators' Conference, pp 251-258 (The Australasian Institute of Mining and Metallurgy: Melbourne).
FORMAL CITATION:Northcote, A E A, 2011. A comparison of skip loading systems from an operational, maintenance, safety and capital cost estimate perspective, in Proceedings 11th AusIMM Underground Operators' Conference, pp 251-258 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
A E A Northcote
-
A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate PerspectivePDFThis product is exclusive to Digital library subscription
-
A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate PerspectivePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 0.392 Mb.
- Unique ID: P201103030