Ground Support Design and Application for Developing in Pastefill at BHP Billiton - Cannington Mine
Cannington Mine has been developing through paste backfilled stopes since the year 2000. These paste drives have been used as either production drill accesses or long-term bypasses. Prior to this study, the ground support requirements for each paste development cut were: an initial 50 mm layer of fibrecrete, weld mesh bolted with 2.4 m split sets, followed by a second coat of 50 mm fibrecrete. Both layers of fibrecrete and the layer of mesh were to be installed before the next cut could be bored and fired. This support regime proved successful at Cannington, however, the total cycle time for each cut was lengthy due to the installation and curing times associated with each layer of surface support. In an effort to reduce the cycle time a study was carried out, with the aid of RocScience's Phase2 numerical modelling software. The modelling reviewed all of the parameters controlling the stability of a newly excavated development cut. The parameters studied included the early strength of fibrecrete, the ground support load capacity, and the strength of the paste fill masses which varies depending on the cement content._x000D_
As a result of the study, the ground support standard was revised. The revision has significantly decreased the cycle time as well as fibrecrete consumption, all the while maintaining the safety of personnel and equipment._x000D_
FORMAL CITATION:Li, J, Todd, J K and Campbel, A, 2011. Ground support design and application for developing in pastefill at BHP Billiton - Cannington mine, in Proceedings 11th AusIMM Underground Operators' Conference , pp 201-206 (The Australasian Institute of Mining and Metallurgy: Melbourne).
As a result of the study, the ground support standard was revised. The revision has significantly decreased the cycle time as well as fibrecrete consumption, all the while maintaining the safety of personnel and equipment._x000D_
FORMAL CITATION:Li, J, Todd, J K and Campbel, A, 2011. Ground support design and application for developing in pastefill at BHP Billiton - Cannington mine, in Proceedings 11th AusIMM Underground Operators' Conference , pp 201-206 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
J Li, J K Todd, A Campbell
-
Ground Support Design and Application for Developing in Pastefill at BHP Billiton - Cannington MinePDFThis product is exclusive to Digital library subscription
-
Ground Support Design and Application for Developing in Pastefill at BHP Billiton - Cannington MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 4.379 Mb.