The Development of Radial-in-Reef' Stoping at the Tasmania Gold Mine, Beaconsfield, Tasmania

An alternative stoping method has been adopted for narrow vein stoping at the Tasmania Mine in Northern Tasmania. Colloquially described as Radial-in-Reef' (RiR) stoping, the method employs the drilling of radial rings in the plane of the Reef from a drill stub located at the geographic centre of the proposed stope panel.Production from the Western Zone of the Tasmania Reef has been undertaken remotely from the Reef since 2007, after a detailed geotechnical engineering analysis indicated that the integrity of the sill drives could not guarantee an acceptable level of confidence should an anticipated seismic event occur within a radius of 10 m. The key tenet of the remote mining approach was the exclusion of personnel from sill drives once stoping had commenced. The remote mining method had to be retrofitted' to four existing stoping blocks totalling 11 sill drives which totalled 160 m vertically. The remote mining method proved to be complex, cumbersome and very expensive. However, the ore was extracted successfully.By early 2010, previously developed ore had largely been exhausted and the future development with an orebody open at depth presented the opportunity to review the current extraction method._x000D_
However, the new extraction method needed to maintain the tenet of excluding personnel from sill drives of active stoping blocks, but seek opportunities to reduce the difficult and costly aspects of the previous method. The new Radial-in-Reef' stoping reduced the development requirement from six to two drives per ore block. Cost implications aside, the significant reduction in prestoping extraction ratio was expected to also reduce the likelihood of seismicity. Transverse production rings were designed to be drilled radially from a drill stub mined from a mid-stope footwall drive. Stopes totalling up to 7000 tonnes were planned be fired in a single electronic blast. Extraction was designed to take place from a basal sill drive under teleremote operation. At the time of writing, the method was under trial._x000D_
FORMAL CITATION:Goddard, R and Hills, P B, 2011. The development of radial-in-reef' stoping at the Tasmania gold mine, Beaconsfield, Tasmania, in Proceedings 11th AusIMM Underground Operators' Conference , pp 55-62 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • The Development of Radial-in-Reef' Stoping at the Tasmania Gold Mine, Beaconsfield, Tasmania
    PDF
    This product is exclusive to Digital library subscription
  • The Development of Radial-in-Reef' Stoping at the Tasmania Gold Mine, Beaconsfield, Tasmania
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 2.371 Mb.
  • Unique ID: P201103007

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.