Skip to main content
Conference Proceedings

12th Mill Operators' Conference 2014

Conference Proceedings

12th Mill Operators' Conference 2014

PDF Add to cart

Mitigating the Effect of Surface Coatings on Gold Processing

With the depletion of high-quality ores, the efficiency of extracting difficult gold ores through flotation and leaching becomes very important in the mining industry. Iron contaminants, sulfide and carbonaceous coatings on the surface of gold and gold bearing minerals significantly hinder the recovery of gold during gold processing. As the surface of gold minerals is easily contaminated, coatings of iron oxides and iron hydroxides originated from the grinding process and oxidation of iron sulfides will cause a retarding effect on both gold flotation and leaching.To mitigate the processing issues caused by undesirable surface coatings on gold minerals, a new technology in treating surface coatings of iron contaminants has been developed. The pulp potential and pH of the slurry are altered to allow dissolution of surface coatings which are further excluded by the use of complexing reagents. The current work shows that iron contaminants can be removed from the surfaces of gold through Eh-pH adjustment and chelation which result in significantly improved gold flotation response. The addition of complexants aids the formation of iron chelates to prevent the iron species in the solution from forming iron oxide and iron hydroxide in the flotation conditions.CITATION:Wei, R and Peng, Y, 2014._x000D_
Mitigating the effect of surface coatings on gold processing, in Proceedings 12th AusIMM Mill Operators' Conference 2014 , pp 187-192 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Mitigating the Effect of Surface Coatings on Gold Processing
    PDF
    This product is exclusive to Digital library subscription
  • Mitigating the Effect of Surface Coatings on Gold Processing
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2013
  • PDF Size: 0.804 Mb.
  • Unique ID: P201409021

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.