Skip to main content
Conference Proceedings

13th AusIMM Mill Operators' Conference 2016

Conference Proceedings

13th AusIMM Mill Operators' Conference 2016

PDF Add to cart

The ABC of Mine to Mill and Metal Price Cycles

In the 1990s metal prices were trending in a long-term decline and the usual cost-cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim. But necessity is a strong motivator, and these conditions spurred the Mine to Mill movement that optimised across organisational silos' and utilised new technology tools, innovative software and increased computing power. Many applications of Mine to Mill exploited the fact that comminution is usually the site processing bottleneck and blasting is more efficient at breaking rock than grinding. This approach sought to: understand and characterise rock breakage from mining to the milldevelop models and simulators for blast design, fragmentation, crusher and mill circuitsdevelop tools to measure in real time the particle size distribution of rocks on run-of-mine (ROM) muck piles, at the primary crusher truck dump pocket and on conveyorsensure effective communication across the silos between geologists, blast design engineers, mining engineers and metallurgists.These methods and the technology tools available in the 1990s were widely adopted at numerous sites around the world with significant benefits. Semi-autogenous grinding (SAG) mill throughput increases of 10-20 per cent were common. This was the advance the industry desperately needed. It was low capital cost; it was obvious. It was here to stay.Except, in too many cases, it didn't. In the minerals price boom of the 2000s Mine to Mill was no longer necessary to survive', even though it was still good business. Some operations, including some of the early success stories, slipped back to old habits of optimising within organisation silos instead of across them. Fortunately, other operators still embraced Mine to Mill and developed new techniques. Mine to Mill was still successful, but not as widely adopted as we had expected it to be. Now the boom has ended and operations are again under cost pressure. Since these are the same circumstances that created Mine to Mill, it seems time to achieve the wider adoption. Since the 1990s many new or advanced technology tools are now available for Mine to Mill projects: blasthole sensors, new explosives formulations, new blasting techniques and modelling, ore tracking devices, improved image analysis to determine size, texture and colour of coarse ore, grade sensors, whole-stream simulation tools, and even more powerful computing hardware and data analysis software. If we could achieve so much in the 1990s, how much more can we achieve today when we have the same imperative, the same potential and a larger number of high technology tools? Citation: Cameron, P, Drinkwater, D and Pease, J, 2016. The ABC of Mine to Mill and Metal Price Cycles, in Proceedings 13th AusIMM Mill Operators' Conference 2016, pp349-358 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • The ABC of Mine to Mill and Metal Price Cycles
    PDF
    This product is exclusive to Digital library subscription
  • The ABC of Mine to Mill and Metal Price Cycles
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2015
  • PDF Size: 2.814 Mb.
  • Unique ID: P201608041

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.