Skip to main content
Conference Proceedings

13th Australian Tunnelling Conference

Conference Proceedings

13th Australian Tunnelling Conference

PDF Add to cart

Excavating a Tunnel in the Foothills of the Southern Alps of New Zealand

Pike River Coal Limited (PRCL) is opening a new underground coal mine in the Paparoa Ranges north-east of Greymouth. To access the coal reserves, PRCL have had to build a 13 km access road through regrowth and virgin forest, and appointed McConnell Dowell Constructors Limited, with URS New Zealand Limited as their consulting engineers, to construct the final access link: a 2.3 km long, 5.5 m wide and 4.5 m high incline tunnel._x000D_
This paper discusses the logistical issues of construction in an isolated pristine forest in mountain land and how they were addressed. It provides an overview of the 90 per cent complete tunnel and how challenging rock conditions have been mastered. It outlines briefly the remaining work which is construction of pit bottom workings where the mine infrastructure will be housed and construction of a 110 m deep, 4.0 m diameter, vertical ventilation shaft.
Return to parent product
  • Excavating a Tunnel in the Foothills of the Southern Alps of New Zealand
    PDF
    This product is exclusive to Digital library subscription
  • Excavating a Tunnel in the Foothills of the Southern Alps of New Zealand
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2008
  • PDF Size: 0.915 Mb.
  • Unique ID: P200803045

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.