Selection of Primary Support in the EastLink Tunnels

The EastLink project is a 39 km tollway to the east of Melbourne and includes twin three-lane 1.5 km driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the Mullum Mullum Valley to help preserve the unique flora and fauna in the area. This paper describes the process of transferring the support requirements from the drawing board' to the tunnelling face by integrating the temporary support design with the contractor's tunnel excavation and support procedures, including sharing of responsibility between the designer and contractor for selection of the support type and the production of a project specific rock mass classification system to enable more objective determination of ground conditions. The methods developed during the design phase incorporated a formal system of reviews, support selection and feedback by monitoring tunnel and ground responses. During construction, the process was implemented using a set of simple documentation and regular structured communication between the contractor and the designer._x000D_
Return to parent product
  • Selection of Primary Support in the EastLink Tunnels
    PDF
    This product is exclusive to Digital library subscription
  • Selection of Primary Support in the EastLink Tunnels
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2008
  • PDF Size: 0.546 Mb.
  • Unique ID: P200803021

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.