Tanking of tunnels is now often specified when inflows exceed as little as 1 L/s/km with a unit distance of 100 m._x000D_
To demonstrate inflows over a 100 m segment of a tunnel are less than 0.1 L/s with a standard error of 0.01 L/s by timed, gravity filled, volume measurement up and downstream of the segment, the measuring cylinder volume (L) must exceed 10 Q, where Q is the flow in L/s, and the number measurements taken and averaged must exceed 20 . If a standard error of 0.02 L/s is acceptable then 5Q2 measurements must be taken and averaged._x000D_
If gravity filling is not possible then the number, n, of repeat pumped container measurement required is given by: where:is the 100 m section leakage is the volume filling time is the standard error of volume measurementZ is the standard normal variateK is a coefficient dependent on physical measurement conditions Based on analysis of field data an indicative coefficient of variation of volume measurement is ~0.05.
To demonstrate inflows over a 100 m segment of a tunnel are less than 0.1 L/s with a standard error of 0.01 L/s by timed, gravity filled, volume measurement up and downstream of the segment, the measuring cylinder volume (L) must exceed 10 Q, where Q is the flow in L/s, and the number measurements taken and averaged must exceed 20 . If a standard error of 0.02 L/s is acceptable then 5Q2 measurements must be taken and averaged._x000D_
If gravity filling is not possible then the number, n, of repeat pumped container measurement required is given by: where:is the 100 m section leakage is the volume filling time is the standard error of volume measurementZ is the standard normal variateK is a coefficient dependent on physical measurement conditions Based on analysis of field data an indicative coefficient of variation of volume measurement is ~0.05.
Contributor(s):
W Meynink, R Witt, M Lowing
-
Tunnel Groundwater Inflow MeasurementPDFThis product is exclusive to Digital library subscription
-
Tunnel Groundwater Inflow MeasurementPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2008
- PDF Size: 0.096 Mb.
- Unique ID: P200803029