Skip to main content
Conference Proceedings

13th Australian Tunnelling Conference

Conference Proceedings

13th Australian Tunnelling Conference

PDF Add to cart

Twin Stacked Tunnels - KDB200, Kowloon Southern Link, Hong Kong

Construction of twin stacked railway tunnels through mixed ground conditions in the heavily populated urban environment of Hong Kong, including tunnelling in poor ground conditions, with low cover and under or adjacent to sensitive structures with minimal impact was the challenge presented by the tunnelling section of the Kowloon Southern Link project._x000D_
This paper details how twin 1.1 km tunnels of 7.0 m internal diameter were driven by Mixshield tunnel boring machine (TBM) in mixed ground through one of the exclusive shopping and hotel districts in Kowloon. The paper addresses the challenges required to be considered and managed for the success of the project, including ground conditions, TBM selection, Mixshield TBM operation, settlement monitoring and control, ground- borne noise and vibration, proximity to utilities, buildings, roads and operating railways.
Return to parent product
  • Twin Stacked Tunnels - KDB200, Kowloon Southern Link, Hong Kong
    PDF
    This product is exclusive to Digital library subscription
  • Twin Stacked Tunnels - KDB200, Kowloon Southern Link, Hong Kong
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2008
  • PDF Size: 0.538 Mb.
  • Unique ID: P200803058

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.