Conference Proceedings
13th Australian Tunnelling Conference
Conference Proceedings
13th Australian Tunnelling Conference
When the Portal is in the Sea - Design of the Marine Risers and Tunnel Connections for the Gold Coast Desalination Plant
This paper describes the design of the marine riser structures, including the design measures for sealing and protection from flooding, dewatering and connection to the main tunnels, for the Gold Coast desalination plant in Queensland. The risers connect the intake and discharge tunnels to the ocean._x000D_
Construction commenced on both in April 2007._x000D_
The paper describes the key design criteria for the risers, the construction constraints that influenced the design and the design of the main elements of the risers and the connections to the tunnels.
Construction commenced on both in April 2007._x000D_
The paper describes the key design criteria for the risers, the construction constraints that influenced the design and the design of the main elements of the risers and the connections to the tunnels.
Contributor(s):
J Garnier, W Angerer
-
When the Portal is in the Sea - Design of the Marine Risers and Tunnel Connections for the Gold Coast Desalination PlantPDFThis product is exclusive to Digital library subscription
-
When the Portal is in the Sea - Design of the Marine Risers and Tunnel Connections for the Gold Coast Desalination PlantPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2008
- PDF Size: 0.384 Mb.
- Unique ID: P200803003