Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

14th AusIMM Mill Operators' Conference 2018

Conference Proceedings

14th AusIMM Mill Operators' Conference 2018

PDF Add to cart

Advanced mine to mill application at the Barrick Cortez mine

The appropriate design of liners continues to be an issue on many mills worldwide. Loss of milling capacity especially at liner change, uneven wear lives along the mill, substantial scrap on worn liners, excess mill down-time, undesirably short and unreliable wear lives are all common issues. This paper presents a designed approach to liner optimisation that follows a logical path of initial design and step-wise improvements based on liner wear monitoring. The target is to have a good liner design from start-up, then tune the profiles, heights and thicknesses based on wear monitoring. This is conducted as a team of liner specialist, site personnel and liner supplier. The application to the Pustynnoye SAG mill of JSC Altynalmas in Kazakhstan is presented. The increase in liner life by around 50% along with increased mill throughput of over 20% illustrate the huge benefit of the cooperative triumvirate approach through the gains that can be made in productivity and reduced liner costs.CITATION:Powell, M, Kanchibotla, S, Jokovic, V, Hilden, M, Bonfils, B, Musunuri, A, Moyo, P, Yu, S, Young, J, Yaroshak, P, Yalcin, E and Gorain, B, 2018. Advanced mine to mill application at the Barrick Cortez mine, in Proceedings 14th AusIMM Mill Operators' Conference 2018, pp 177-196 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Advanced mine to mill application at the Barrick Cortez mine
    PDF
    This product is exclusive to Digital library subscription
  • Advanced mine to mill application at the Barrick Cortez mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2018
  • PDF Size: 3.346 Mb.
  • Unique ID: P201803015

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.