Skip to main content
Conference Proceedings

14th AusIMM Mill Operators' Conference 2018

Conference Proceedings

14th AusIMM Mill Operators' Conference 2018

PDF Add to cart

Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

Squeezing extra performance from existing equipment (sweating the assets') is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additional capital to facilitate circuit upgrades can be severely constrained. A common challenge, however, is identifying the best combination of settings for different process variables, as their effects can be camouflaged by interactions with other process variables and, of course, noise in historical data.This paper describes a recent investigation at Boyne Smelters Limited to identify strategies to coarsen the product of its dry, fixed-speed, open-circuit AG mill, without the need for installing pre-screens prior to the mill. The product is used as insulation material for the reduction of alumina to aluminium, and an excessively fine product was inhibiting the ability of the cover material to dissipate heat from the underlying anodes. The approach was to undertake a series of experiments, designed according to statistical criteria, to elucidate the effect of key process variables (feed blend and power draw) upon the product sizing. The results provided clarity about what strategies would encourage the production of a more desirable mill product (with some surprises). The study is a good example of how properly designed experiments can identify hidden potential in processing circuits, thereby mitigating the need for capital-intensive upgrades.CITATION:Vizcarra, T G, Hart, M G, Karbowiak, A T and Napier-Munn, T J, 2018. Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited, in Proceedings 14th AusIMM Mill Operators' Conference 2018, pp 207-216 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited
    PDF
    This product is exclusive to Digital library subscription
  • Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2017
  • PDF Size: 0.537 Mb.
  • Unique ID: P201803017

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.