Skip to main content
Conference Proceedings

14th Australasian Tunnelling Conference

Conference Proceedings

14th Australasian Tunnelling Conference

PDF Add to cart

Advancing Cut and Cover Tunnelling in Auckland - Experience Gained from New Lynn Rail Trench

KiwiRail has a goal of significantly improving passenger rail services to west Auckland, as part of its DART (Developing Auckland's Rail Transport) suite of projects. The New Lynn Rail Trench (NLRT) project was a significant component of this work. The NLRT project facilitates essential doubletracking of the Western Auckland line, and provides a new commuter transportation hub within a busy town centre.The 1.5 km stretch of track through the New Lynn town centre has bisected the township for over 80 years. Double-tracking the line provided the opportunity to grade-separate road and rail, which would help to re-connect both sides of the township and enhance public amenity and safety.KiwiRail employed an Early Contractor Involvement (ECI) procurement model engaging a consortium comprising Fletcher Construction, Beca Infrastructure and Synergine to develop a Design and Construct solution.With weak soil conditions and high groundwater levels, a diaphragm wall construction method to form the trench walls was selected as the best solution. Further challenges to construction included working within a narrow rail corridor constrained by buildings along much of the boundary, and a requirement to keep the existing line open for rail services. Detailed construction planning was required to ensure rail and construction safety in a constrained space whilst building the trench walls, propping these walls during excavation, and constructing the base slab in the most efficient way possible.This paper will detail the geotechnical conditions and the additional constraints that made this rail trench a challenging structure to design. It will also describe the fi nal design and construction methodologies that were employed, that allowed very successful completion of the project.Additionally, this paper will review the design and construction lessons applicable to the current Victoria Park Tunnel project, and indeed for all future cut and cover tunnel projects in the Auckland isthmus.
Return to parent product
  • Advancing Cut and Cover Tunnelling in Auckland - Experience Gained from New Lynn Rail Trench
    PDF
    This product is exclusive to Digital library subscription
  • Advancing Cut and Cover Tunnelling in Auckland - Experience Gained from New Lynn Rail Trench
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 0.997 Mb.
  • Unique ID: P201102060

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.