Conference Proceedings
14th Australasian Tunnelling Conference
Conference Proceedings
14th Australasian Tunnelling Conference
Ambuklao Tunnel Plug Construction
The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956, the Ambuklao Dam harnessed the second largest hydro-electric reservoir in Asia. However, due to landslide erosion and prolonged silt infiltration caused by an earthquake in 1990, the power plant has been rendered inoperable since 1999.To bring the power generating facility back to life, the project scope entails the rehabilitation and construction of civil structures, shafts and tunnels. A major component of these works is the decommissioning of a section of the seven metre diameter headrace tunnel by installing a concrete plug. The headrace tunnel is part of a closed waterway system that connects the dam via a shaft, exhibiting a hydrostatic pressure of 13 bar (1300 kPa) at the location of the new tunnel plug. In addition, the power station ball valves have seized ajar and the damaged intake riser is unsafe toaccess thereby requiring the plugging operation to be carried out under live flowing conditions.Working under hydrostatic pressure and live conditions, the headrace plug will be an underwater tremie pour operation that includes drilling and concrete injection through blow out preventer caissons installed in the floor of an underground chamber above the tunnel. The purpose of this paper is to describe the key engineering and planning components involved in this operation including pre- and post-grouting, chamber crane, sonar, local water compensation, jet flushing, drilling, caisson installation, and concrete design, production, delivery and placement. The success of this task rests on the strategic preparation and operational management of risk and safety in a challenging rural environment.
Contributor(s):
B Hayes, R Rooney
-
Ambuklao Tunnel Plug ConstructionPDFThis product is exclusive to Digital library subscription
-
Ambuklao Tunnel Plug ConstructionPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 0.648 Mb.
- Unique ID: P201102009