Conference Proceedings
14th Australasian Tunnelling Conference
Conference Proceedings
14th Australasian Tunnelling Conference
Sandgate Avenue Flood Alleviation Project, Stage 1 -Slurry Treatment Plant - Lessons Learnt
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchment, in order to mitigate against the risk of flooding of Frankston's central activity district (CAD).The project involves the construction of a 1550 m long, 2.5 m internal diameter tunnel, commencing upstream at the Monash University Peninsula Campus and traversing approximately west to the outlet located at Kananook Creek. The tunnel was excavated by a dual slurry-earth pressure balance tunnel boring machine (TBM), with the depth to tunnel crown ranging from 0.7 m to 14 m below the natural surface level. The TBM navigated 500 m radius curves, with a maximum drive length of 608 m. The tunnel lining consists of 2.5 m internal diameter, 250 mm thick reinforced concrete jacking pipe.The geotechnical conditions along the tunnel alignment consisted of mixed face ground conditions, predominately clay, with clayey sand and sandy clay and some sand deposits near Kananook Creek.This paper presents the challenges associated with the operation of the slurry separation plant during tunnel construction. In particular, the paper focuses the impact of slurry separation on tunnel advance rates, the lessons learnt during construction with regards to slurry separation and on the decision to adopt a dual slurry-earth pressure balance shield TBM. In addition this paper highlights the importance of having a thorough understanding of the slurry separation requirements on a slurry TBM project prior to selecting the necessary plant.
Contributor(s):
M Weeks, A Banks
-
Sandgate Avenue Flood Alleviation Project, Stage 1 -Slurry Treatment Plant - Lessons LearntPDFThis product is exclusive to Digital library subscription
-
Sandgate Avenue Flood Alleviation Project, Stage 1 -Slurry Treatment Plant - Lessons LearntPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 2.373 Mb.
- Unique ID: P201102013