Skip to main content
Conference Proceedings

14th Australasian Tunnelling Conference

Conference Proceedings

14th Australasian Tunnelling Conference

PDF Add to cart

Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate - Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on the southwest edge of the city, southwards to connect with the Hobsons Bay Main Sewer in Port Melbourne. The tunnel boring machine (TBM) tunnelled section of the works terminates at the Yarra River where the delta geology and alignment requirements precluded the use of underground tunnelling methods. The 132 m long river crossing works involve a cut-and-cover excavation within a staged fl ooded cofferdam construction to construct an immersed tube tunnel as an extension of the TBM works.This paper reports on the development of the staged construction method and highlights the geotechnical and structural design aspects involved in building a new sewer in the Yarra River to close the gap between the new TBM driven and pipe-jacked tunnels.
Return to parent product
  • Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate - Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project
    PDF
    This product is exclusive to Digital library subscription
  • Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate - Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 1.167 Mb.
  • Unique ID: P201102004

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.