Skip to main content
Conference Proceedings

14th Australasian Tunnelling Conference

Conference Proceedings

14th Australasian Tunnelling Conference

PDF Add to cart

Thermal Modelling and Mitigation Measures for the Bogong Power Development

The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to theperformance of the scheme as it permanently seals the head race tunnel under approximately 300 m head of water.The location of the plug in the headrace tunnel was determined by a programme of in situ rock stress testing using both hydrofracturing and over coring stress testing methods.In recognition of the importance of the plug, the Head Contract specification requires that its temperature during hydration be controlled using an embedded cooling system. In addition, contact grouting and curtain grouting around the plug cannot commence until thermal contraction was substantially complete.This paper describes the use of bespoke fi nite element software to model the temperature rise in the plug and design mitigation measures to control temperature rise in the plug. These measures include restricting the concrete placing temperature to 10C, incorporating 39 per cent fly ash in the concrete and installing embedded cooling circuits.Site trials were undertaken to calibrate the model for the proposed concrete mix. The cooling system comprised 25 mm ID pipes forming twelve separate circuits that fed 7C water from a single chiller unit. The cooling system reduced the peak temperature in the plug to approximately 30C and the associated risk of early-cracking. The time before contact grouting could commence was shortened to less than two weeks from casting.
Return to parent product
  • Thermal Modelling and Mitigation Measures for the Bogong Power Development
    PDF
    This product is exclusive to Digital library subscription
  • Thermal Modelling and Mitigation Measures for the Bogong Power Development
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 0.658 Mb.
  • Unique ID: P201102007

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.