Western Ring Route - Waterview Connection: Calculation of Ground Settlements and their Effects
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of undrained' driven tunnels, 500 m of drained cut-and-cover tunnel and tunnel portals.The project is aligned beneath a stream valley of Oakley Creek, which is incised through alluvium and in places overlain by landfill, between Mt Albert volcano and a ridge formed in alternating sandstones and siltstones. The resulting topography, geology and hydrogeology of the tunnel alignment are complex.The Assessment of Effects required estimation of the likely settlements resulting from the tunnel construction and assessment of their effects on the buildings, services and other features. A conservative approach was taken when estimating settlements in order to provide an upper bound estimate of the consequent effects. There are three sources of these settlements: mechanical settlement from the tunnel excavation, mechanical settlement from the displacement of retaining walls and consolidation settlement from the groundwater drawdowns during construction and, in some cases, in the long-term.The settlements from these sources were calculated independently and then combined to identify the most critical effects. These combined settlements were used to assess the potential damage to the buildings, services and other features above and around the tunnels. The combined settlement results generally followed the anticipated trough shape centred on the underlying tunnel but with some noticeable effects relating to the underlying geology and hydrogeology.The effects on buildings were typically assessed as negligible with some areas of very slight to moderate damage predicted. Effects on services are anticipated to be minor but some large and older pipes will require specific monitoring during construction. A monitoring programme is proposed to allow the actual settlement and effects to be compared to those estimated with appropriate responses should those effects significantly differ.This paper describes the methods used to calculate and combine the settlements and assess their effects.
Contributor(s):
J P Burr, G Alexander
-
Western Ring Route - Waterview Connection: Calculation of Ground Settlements and their EffectsPDFThis product is exclusive to Digital library subscription
-
Western Ring Route - Waterview Connection: Calculation of Ground Settlements and their EffectsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 1.211 Mb.
- Unique ID: P201102030