Commissioning of the Barrytown Ilmenite Pilot Plant
The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced magnetic concentrate from this date._x000D_
The Drymill was commissioned on the 27 January 1990 and produced product grade ilmenite successfully from the onset._x000D_
The commissioning period was exceptionally short by normal standards and few problems were encountered. This paper concludes with general observations of operations of the pilot plant.
The Drymill was commissioned on the 27 January 1990 and produced product grade ilmenite successfully from the onset._x000D_
The commissioning period was exceptionally short by normal standards and few problems were encountered. This paper concludes with general observations of operations of the pilot plant.
Contributor(s):
A P Burgess, T Wootton
-
Commissioning of the Barrytown Ilmenite Pilot PlantPDFThis product is exclusive to Digital library subscription
-
Commissioning of the Barrytown Ilmenite Pilot PlantPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1990
- Unique ID: P199002030NZ