Conference Proceedings
1998 AusIMM Annual Conference - The Mining Cycle
Conference Proceedings
1998 AusIMM Annual Conference - The Mining Cycle
Environmental Issues in the Development of the Pasminco Century Project
The Century zinc-lead orebody was discovered in 1990 and contains sufficient reserves to sustain open cut mining at 5 Mtpa of ore for approximately 20 years. It is proposed to pipe mineral concentrate in slurry form 300 km from the mine to the port of Karumba on the Gulf of Carpentaria. The concentrate will be dewatered at Karumba before being transported off-shore to deeper water in a self-unloading shuttle vessel for transfer to export bulk carriers._x000D_
The four main environmental issues that attracted attention during the impact assessment phase of the project were: the selection of Karumba as the export port, the use of a pipeline to transport concentrate, the risk of concentrate spillage in the marine environment, and aquifer drawdown in the vicinity of the mine._x000D_
This paper discusses these issues with emphasis on the context of the relationship between the Pasminco Century Project and Gulf communities. Environmental safeguards are discussed, including those that arose out of the negotiations regarding Aboriginal native title.
The four main environmental issues that attracted attention during the impact assessment phase of the project were: the selection of Karumba as the export port, the use of a pipeline to transport concentrate, the risk of concentrate spillage in the marine environment, and aquifer drawdown in the vicinity of the mine._x000D_
This paper discusses these issues with emphasis on the context of the relationship between the Pasminco Century Project and Gulf communities. Environmental safeguards are discussed, including those that arose out of the negotiations regarding Aboriginal native title.
Contributor(s):
A T Irving
-
Environmental Issues in the Development of the Pasminco Century ProjectPDFThis product is exclusive to Digital library subscription
-
Environmental Issues in the Development of the Pasminco Century ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 0.023 Mb.
- Unique ID: P199802061