MIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMs' copper smelter in Mount Isa, and copper refinery in Townsville. The upgrade of the copper smelter will enable the smelter to produce 250 000 tpa of copper with a single primary smelting unit, the copper Isasmelt furnace installed in 1992._x000D_
The copper Isasmelt furnace currently smelts concentrate containing 145 000 tpa copper. To reduce the risk associated with the copper smelter upgrade, and shorten the ramp up time of the upgraded smelter, two high-rate trials were undertaken in 1997 to demonstrate that the copper Isasmelt furnace could, with an additional 525 tpd of tonnage oxygen, treat concentrates containing 250 000 tpa copper._x000D_
During the trials the concentrate feed rate to the Isasmelt furnace was increased from its average rate of 100 tph of concentrate to 150 tph of concentrate. The increase in the capacity of the furnace was achieved by: supplementing the installed tonnage oxygen capacity of 595 tpd with an additional 300 tpd supply; reducing variability in the furnace feed rate from 25 per cent to less than 5 per cent; and reducing tramp air._x000D_
The Isasmelt furnace smelted concentrate at a rate of 140 to 150 tph for four hours 25 minutes during Trial 1, and at a rate of 150 tph of concentrate for five hours and 30 minutes during Trial 2. The oxygen utilisation was 100 per cent during the trials with the process remaining under control._x000D_
As a result of the development work for the trials the average treatment rate of the furnace under normal conditions increased by ten per cent.
The copper Isasmelt furnace currently smelts concentrate containing 145 000 tpa copper. To reduce the risk associated with the copper smelter upgrade, and shorten the ramp up time of the upgraded smelter, two high-rate trials were undertaken in 1997 to demonstrate that the copper Isasmelt furnace could, with an additional 525 tpd of tonnage oxygen, treat concentrates containing 250 000 tpa copper._x000D_
During the trials the concentrate feed rate to the Isasmelt furnace was increased from its average rate of 100 tph of concentrate to 150 tph of concentrate. The increase in the capacity of the furnace was achieved by: supplementing the installed tonnage oxygen capacity of 595 tpd with an additional 300 tpd supply; reducing variability in the furnace feed rate from 25 per cent to less than 5 per cent; and reducing tramp air._x000D_
The Isasmelt furnace smelted concentrate at a rate of 140 to 150 tph for four hours 25 minutes during Trial 1, and at a rate of 150 tph of concentrate for five hours and 30 minutes during Trial 2. The oxygen utilisation was 100 per cent during the trials with the process remaining under control._x000D_
As a result of the development work for the trials the average treatment rate of the furnace under normal conditions increased by ten per cent.
Contributor(s):
J S Edwards
-
Isasmelt - A 250 000 TPA Copper Smelting FurnacePDFThis product is exclusive to Digital library subscription
-
Isasmelt - A 250 000 TPA Copper Smelting FurnacePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 0.223 Mb.
- Unique ID: P199802055