Skip to main content
Conference Proceedings

1998 AusIMM Annual Conference - The Mining Cycle

Conference Proceedings

1998 AusIMM Annual Conference - The Mining Cycle

PDF Add to cart

The Design of Ventilation and Refrigeration Systems and Engineering Controls for the Enterprise Mine

The Enterprise Mine Project (EMP) is being developed by Mount Isa Mines Limited as the future source of copper ore at the Mt Isa mining and processing complex. Environmental engineering is one of the major technical challenges facing the project because of the depth of the orebodies, high virgin rock temperatures and hot ambient surface temperatures in summer. This paper discusses the engineering principles adopted by EMP to manage the risks associated with working in these adverse thermal conditions.
Return to parent product
  • The Design of Ventilation and Refrigeration Systems and Engineering Controls for the Enterprise Mine
    PDF
    This product is exclusive to Digital library subscription
  • The Design of Ventilation and Refrigeration Systems and Engineering Controls for the Enterprise Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1998
  • PDF Size: 0.774 Mb.
  • Unique ID: P199802025

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.