Ernest Henry Mining commenced operations on its copper-gold project in August 1997, some two months ahead of schedule and ten per cent ($35 million) under budget. The mine is located in the highly prospective Mount Isa/Cloncurry mineral district in north-west Queensland, approximately 38 km north-east of Cloncurry._x000D_
The developer and operator of the project is Ernest Henry Mining Pty Ltd (EHM), an incorporated joint venture between MIM Holdings Limited (51 per cent) and Savage Resources Limited (49 per cent)._x000D_
The deposit is located approximately 40 km north of Cloncurry in North West Queensland and lies beneath a featureless black soil plain with no significant creeks or gullies cutting across the site. Vegetation is sparse and consists essentially of Mitchell grass with occasional low shrubs and trees._x000D_
Up to nine million tonnes of ore and over 43 million tonnes of waste will be extracted each year from an open pit operation to produce approximately 350 000 tonnes of concentrate when in full production.
The developer and operator of the project is Ernest Henry Mining Pty Ltd (EHM), an incorporated joint venture between MIM Holdings Limited (51 per cent) and Savage Resources Limited (49 per cent)._x000D_
The deposit is located approximately 40 km north of Cloncurry in North West Queensland and lies beneath a featureless black soil plain with no significant creeks or gullies cutting across the site. Vegetation is sparse and consists essentially of Mitchell grass with occasional low shrubs and trees._x000D_
Up to nine million tonnes of ore and over 43 million tonnes of waste will be extracted each year from an open pit operation to produce approximately 350 000 tonnes of concentrate when in full production.
Contributor(s):
M Lewis, T Amiconi
-
The Ernest Henry Mine Project - The Mining Cycle'PDFThis product is exclusive to Digital library subscription
-
The Ernest Henry Mine Project - The Mining Cycle'PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 2.613 Mb.
- Unique ID: P199802005