Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May 2018, when more than 1 Mt of rock dislodged over six, 30 m high bench stacks and impacted the pit floor. Since 2011 approximately 1.250 Mt of material has fallen from the East wall at Fimiston Pit across three failure events (2011, 2018 and 2020). Each failure has been associated with major structures intersecting the pit walls: the Fiji Fault, the Australia East Secondary Splay Fault and the EWD3 Fault. In each instance the trigger for failure has been transient pore pressure in the pit walls.
Northern Star will mine a cut back behind the failure area over a vertical distance of 180 m. Cut back mining will include the extraction of a remaining in situ wedge, which is assessed as kinematically able to fail, and a subvertical failure backscarp in Stage 1. A substantial amount of rill material from the 2018 and 2020 failures will be extracted in Stage 2.
This paper presents the methodology in use to mine Stage 1 of the cut back, safely, through this potentially high-risk area, detailing the specific mining methodology employed, the controls put in place and the monitoring required.
Day-to-day monitoring will be undertaken using the already installed slope stability radar and will feed into a daily assessment of activities which may be undertaken in the cut back area. Initial activities will focus on eliminating the potentially unstable wedge and vertical backscarp with use of innovative drill and blast techniques/products and the extensive use of remote capable equipment to limit personnel exposure.
Return to parent product
  • Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)
    PDF
    This product is exclusive to Digital library subscription
  • Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2022
  • Pages: 11
  • PDF Size: 2.246 Mb.
  • Unique ID: P-03049-L8T2H7

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.