This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most efficient mining’ regarding cost and performance. This question can only be answered through an extensive contract mining tender process and conducting a comprehensive comparison to evaluate the transition viability. Karma mine, located in Burkina Faso, is the subject of this paper.
The Tender model included sales of equipment, parts and tooling associated with the traditional Load and Haul Schedule of Rates (SOR).
The methodology focused on the structure of the tender process, which consists in the development of a SOR based on haulage profiles and mining schedule. This is a new Endeavour framework that allowed the bidders to compete on an even level. This was performed using a systemic analysis which encompassed all the elements involved in a transition such as the Human Resources (HR), taxes and customs implications, directs and non-direct costs (Finance and interest on assets, depreciation, insurance), contractor risk profiling. It was assessed against the normalised internal pricing tender-based. This paper gives an insight into how a West African mining operation addressed the sensitivities of the HR functions against the commercial aspects. This was one of the most successful transitions in West Africa and was carried out during the COVID crisis.
The outcome of this project has created value by detailing a lesson learned model for both commercial and HR aspects. This discusses the commercial comparisons along with the internal model with the underlying HR functions as a risk factor that could have jeopardised the continuation of the operation. This resulted in a smooth transition with the additional cash flow generated by the sale of the parts and equipment turned Karma into a viable operation.
The Tender model included sales of equipment, parts and tooling associated with the traditional Load and Haul Schedule of Rates (SOR).
The methodology focused on the structure of the tender process, which consists in the development of a SOR based on haulage profiles and mining schedule. This is a new Endeavour framework that allowed the bidders to compete on an even level. This was performed using a systemic analysis which encompassed all the elements involved in a transition such as the Human Resources (HR), taxes and customs implications, directs and non-direct costs (Finance and interest on assets, depreciation, insurance), contractor risk profiling. It was assessed against the normalised internal pricing tender-based. This paper gives an insight into how a West African mining operation addressed the sensitivities of the HR functions against the commercial aspects. This was one of the most successful transitions in West Africa and was carried out during the COVID crisis.
The outcome of this project has created value by detailing a lesson learned model for both commercial and HR aspects. This discusses the commercial comparisons along with the internal model with the underlying HR functions as a risk factor that could have jeopardised the continuation of the operation. This resulted in a smooth transition with the additional cash flow generated by the sale of the parts and equipment turned Karma into a viable operation.
Contributor(s):
Y G Anoman
-
Transition from owner mining to contract mining – a structured tender process using a holistic approachPDFThis product is exclusive to Digital library subscription
-
Transition from owner mining to contract mining – a structured tender process using a holistic approachPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2022
- Pages: 27
- PDF Size: 0.496 Mb.
- Unique ID: P-03036-L4H6Q1