Conference Proceedings
21st Century Higher Production Coal Mining Systems Symposium, Wollongong
Conference Proceedings
21st Century Higher Production Coal Mining Systems Symposium, Wollongong
Rational Longwall Layout Design Based on Numerical Stress Analysis
Rational design of layouts for longwall operations is greatly facilitated by use of an accurate and economical method for predicting stresses and displacements. The displacement discontinuity method (a form of boundary element method) is based on replacing actual excavation geometries by thin slits of the same plan area._x000D_
This approach allows three-dimensional stress- analysis at a fraction of the cost of alternative methods. The analyses can be readily performed on economical microcomputers, putting the analysis capability within the reach of mine-site personnel. This paper describes investigations associated with the German Creek Central Colliery, the first longwall operation in Queensland's Bowen Basin. The material properties used in the model, in particular the rock mass and goaf properties, have been 'tuned' to fit stress measurements obtained during extraction of the first and second longwall panels at the mine. The study shows that model predictions based on suitably scaled anisotropic rock strata properties are in good agreement with the stress measurements made to date. This model predicts average chain pillar loads significantly higher than predicted by models based on United Kingdom conditions. A working chain pillar design method is proposed using average pillar loads predicted by the numerical model and ultimate strength characteristics given by Bieniawski's formula.
This approach allows three-dimensional stress- analysis at a fraction of the cost of alternative methods. The analyses can be readily performed on economical microcomputers, putting the analysis capability within the reach of mine-site personnel. This paper describes investigations associated with the German Creek Central Colliery, the first longwall operation in Queensland's Bowen Basin. The material properties used in the model, in particular the rock mass and goaf properties, have been 'tuned' to fit stress measurements obtained during extraction of the first and second longwall panels at the mine. The study shows that model predictions based on suitably scaled anisotropic rock strata properties are in good agreement with the stress measurements made to date. This model predicts average chain pillar loads significantly higher than predicted by models based on United Kingdom conditions. A working chain pillar design method is proposed using average pillar loads predicted by the numerical model and ultimate strength characteristics given by Bieniawski's formula.
Contributor(s):
L J Wardle, G Klenowski
-
Rational Longwall Layout Design Based on Numerical Stress AnalysisPDFThis product is exclusive to Digital library subscription
-
Rational Longwall Layout Design Based on Numerical Stress AnalysisPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1988
- PDF Size: 0.872 Mb.
- Unique ID: P198801030