Skip to main content
Conference Proceedings

35th APCOM Symposium 2011

Conference Proceedings

35th APCOM Symposium 2011

PDF Add to cart

A Practical Approach to Truck Dispatch for Open Pit Mines

According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck dispatching in real open pit mine environments, implemented in the commercial package SmartMine, marketed by Devex SA. The first stage of this approach defines the optimal number of trucks that maximises the tonnage production by means of a robust linear programming model, which considers the operational constraints of a real mining process. The second stage uses a dynamic dispatching heuristic joining computational simulation and multicriterion optimisation techniques for decision making for truck dispatching. Another relevant contribution of this work is the publication of realistic instances collected from a dispatching system managing an iron mine, containing information about the hauling and loading fleet, the equipment situation when the working shift starts, cycle times, the time line of special occurrences (such as equipment stoppages and loading equipment reallocation in order to satisfy the mine planning) and the tonnage produced. These instances were generated with the purpose of submitting the method to the test of a real situation that considers the uncertainties existing in the process studied. The proposed approach was validated by means of a discrete event simulation model applied to the previously designated instances. Using this multistage approach as a mechanism for dispatch decision making, it is shown that the haulage fleet productivity increased when compared with the real values reported from the instances. These results are important because they show that the proposed approach generates efficient dispatch decisions for trucks operating in a real environment, reducing operating costs, increasing production and making the mine more competitive.
Return to parent product
  • A Practical Approach to Truck Dispatch for Open Pit Mines
    PDF
    This product is exclusive to Digital library subscription
  • A Practical Approach to Truck Dispatch for Open Pit Mines
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 0.274 Mb.
  • Unique ID: P201111071

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.