Selection Criteria for Open Pit Production Equipment - Payload Distributions and the 10/10/20' Policy

The aim of this study is to examine the volumetric and mass movement characteristics of load and haul operations using statistical modelling of relatively large samples of bucket loads that are transported as small samples in the form of truck payloads. Generally, the factors influencing bucket load variability are random, difficult to predict and to control. In the process of loading trucks the underlying variability of individual bucket loads will determine the variability of truck payloads. Bucket loads of material prepared by drilling and blasting for loading into trucks are fundamental quantities in open pit mine production. A study of payload data from a large surface mining operation indicates that bucket loads and truck payloads that are a small sample of bucket loads are normally distributed. Truck payloads have a reduced dispersion compared with bucket loads that is an inverse 0.5 power function of the number of passes per truck payload. Comparison of statistical modelling results with the 10/10/20' policy promoted by Caterpillar Global Mining Inc, indicate that compliance with the 10/10' part of the policy, applying to truck overloading is facilitated, as the coefficient of variation of truck payloads decreases, as a result of the increasing number of loading passes. Compliance with the more stringent 20' part of the policy, relating to safe steering and braking is also facilitated, albeit at lower coefficient of variation for similar reasons.
Return to parent product
  • Selection Criteria for Open Pit Production Equipment - Payload Distributions and the 10/10/20' Policy
    PDF
    This product is exclusive to Digital library subscription
  • Selection Criteria for Open Pit Production Equipment - Payload Distributions and the 10/10/20' Policy
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 0.218 Mb.
  • Unique ID: P201111031

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.