Reducing Cost by Going Underground
In a stipulated hard rock situation, drilling and blasting costs per tonne in open cutting or underground operations are comparable. In open cuts the drilling and blasting costs per tonne of ore are multiplied by the waste ratio._x000D_
Conventional underground loading and haulage practices are so batch-oriented that the cost per tonne of ore handled is a large integral multiplier of open out costs per tonne loaded and hauled._x000D_
If underground costs are to be reduced to compare favourably with open out costs then loading and hauling practices underground must be converted to a non-batch continuous system. This can be achieved by utilising gravity to control ore to mobile crushers feeding conveyors running direct to surface.
Conventional underground loading and haulage practices are so batch-oriented that the cost per tonne of ore handled is a large integral multiplier of open out costs per tonne loaded and hauled._x000D_
If underground costs are to be reduced to compare favourably with open out costs then loading and hauling practices underground must be converted to a non-batch continuous system. This can be achieved by utilising gravity to control ore to mobile crushers feeding conveyors running direct to surface.
Contributor(s):
H Stevenson
-
Reducing Cost by Going UndergroundPDFThis product is exclusive to Digital library subscription
-
Reducing Cost by Going UndergroundPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1985
- PDF Size: 0.129 Mb.
- Unique ID: P198503012