Skip to main content
Conference Proceedings

Annual Conference, Brisbane

Conference Proceedings

Annual Conference, Brisbane

PDF Add to cart

Reducing Cost by Going Underground

In a stipulated hard rock situation, drilling and blasting costs per tonne in open cutting or underground operations are comparable. In open cuts the drilling and blasting costs per tonne of ore are multiplied by the waste ratio._x000D_
Conventional underground loading and haulage practices are so batch-oriented that the cost per tonne of ore handled is a large integral multiplier of open out costs per tonne loaded and hauled._x000D_
If underground costs are to be reduced to compare favourably with open out costs then loading and hauling practices underground must be converted to a non-batch continuous system. This can be achieved by utilising gravity to control ore to mobile crushers feeding conveyors running direct to surface.
Return to parent product
  • Reducing Cost by Going Underground
    PDF
    This product is exclusive to Digital library subscription
  • Reducing Cost by Going Underground
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1985
  • PDF Size: 0.129 Mb.
  • Unique ID: P198503012

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.