Conference Proceedings
Annual Conference, Darwin
Conference Proceedings
Annual Conference, Darwin
Minimising Sediment Mobilisation within the Ranger Project Area
It has been identified that particulate matter in the form of suspended solids and bed load has the ability to adsorb heavy metals._x000D_
Each year Ranger Uranium Mines Pty Ltd (RUM) identifies potential danger areas which could become major sediment sources during the wet season. Methods of suppressing sediment uptake such as hydromulching and coating areas with Poly Vinyl Acetate (PVA) glue are used._x000D_
Other methods of reducing the sediment load after uptake such as diversion bunds, filters across drains, stone filters, minor sumps and settling ponds are also used. The 1983/84 wet season saw drain sediment loads reduced to acceptable levels before the water reached the outside environment. Studies to qualify and quantify flows from minor drains are still underway.
Each year Ranger Uranium Mines Pty Ltd (RUM) identifies potential danger areas which could become major sediment sources during the wet season. Methods of suppressing sediment uptake such as hydromulching and coating areas with Poly Vinyl Acetate (PVA) glue are used._x000D_
Other methods of reducing the sediment load after uptake such as diversion bunds, filters across drains, stone filters, minor sumps and settling ponds are also used. The 1983/84 wet season saw drain sediment loads reduced to acceptable levels before the water reached the outside environment. Studies to qualify and quantify flows from minor drains are still underway.
Contributor(s):
C J Gilbert, A B Armstrong
-
Minimising Sediment Mobilisation within the Ranger Project AreaPDFThis product is exclusive to Digital library subscription
-
Minimising Sediment Mobilisation within the Ranger Project AreaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1984
- PDF Size: 0.615 Mb.
- Unique ID: P198403022