Skip to main content
Conference Proceedings

Annual Conference, Darwin

Conference Proceedings

Annual Conference, Darwin

PDF Add to cart

Minimising Sediment Mobilisation within the Ranger Project Area

It has been identified that particulate matter in the form of suspended solids and bed load has the ability to adsorb heavy metals._x000D_
Each year Ranger Uranium Mines Pty Ltd (RUM) identifies potential danger areas which could become major sediment sources during the wet season. Methods of suppressing sediment uptake such as hydromulching and coating areas with Poly Vinyl Acetate (PVA) glue are used._x000D_
Other methods of reducing the sediment load after uptake such as diversion bunds, filters across drains, stone filters, minor sumps and settling ponds are also used. The 1983/84 wet season saw drain sediment loads reduced to acceptable levels before the water reached the outside environment. Studies to qualify and quantify flows from minor drains are still underway.
Return to parent product
  • Minimising Sediment Mobilisation within the Ranger Project Area
    PDF
    This product is exclusive to Digital library subscription
  • Minimising Sediment Mobilisation within the Ranger Project Area
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1984
  • PDF Size: 0.615 Mb.
  • Unique ID: P198403022

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.