Some Design and Operating Aspects of the Ranger Uranium Mine Treatment Plant
Environmental considerations were key factors in the design of the Ranger Uranium Mines treatment plant. The mine is located adjacent to the Kakadu National Park and has an average rainfall of 1.6m per annum. Initially, no contaminated water or liquid effluents are to be released from the project area and thus water management is a key design and operating fact. Particulate and gas emission criteria influenced design as did occupational hygiene factors (dust, radon, housekeeping, maintenance access). Equipment selection and engineering standards were conservative and resulted in the plant attaining design performance in less than three months from the date of commissioning. A number of mechanical and operational problems were experienced and are discussed in the paper, however none of these problems have had a significant effect on production.
Contributor(s):
P A Baily
-
Some Design and Operating Aspects of the Ranger Uranium Mine Treatment PlantPDFThis product is exclusive to Digital library subscription
-
Some Design and Operating Aspects of the Ranger Uranium Mine Treatment PlantPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1984
- PDF Size: 0.585 Mb.
- Unique ID: P198403031