Conference Proceedings
Annual Conference, Darwin
Conference Proceedings
Annual Conference, Darwin
The McArthur River Project
The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/t Ag. Major studies have been carried out continuously since 1955 over the deposit and in the general region. This work is continuing. A small underground mine was developed by driving a decline tunnel to intersect the mineralization 80m below the surface. This provided a fully representative sample of the total deposit unaffected by weathering or oxidation, and was available for the major test program carried out in a pilot plant built to determine the full metallurgical charac- teristics of the ore. The pilot plant operations followed investigations by research institutions, both in Australia and overseas, into the problems of this ultra-fine grained ore._x000D_
The ultra-fine grained nature of the ore required grinding to an average size of 95% passing 37 micro metres or 400 Tyler mesh. A major feasibility and environmental report was submitted to the government covering all aspects of a development program. The geological, engineering, metal- lurgical, economic, cultural and environmental submissions contained in this report were studied by external consult- ants employed by the government, who agreed with the conclusions that the McArthur HYC deposit is at present Uneconomic.
The ultra-fine grained nature of the ore required grinding to an average size of 95% passing 37 micro metres or 400 Tyler mesh. A major feasibility and environmental report was submitted to the government covering all aspects of a development program. The geological, engineering, metal- lurgical, economic, cultural and environmental submissions contained in this report were studied by external consult- ants employed by the government, who agreed with the conclusions that the McArthur HYC deposit is at present Uneconomic.
Contributor(s):
D T Buchanan
-
The McArthur River ProjectPDFThis product is exclusive to Digital library subscription
-
The McArthur River ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1984
- PDF Size: 0.978 Mb.
- Unique ID: P198403043