The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria
A metallurgical evaluation of the Argyle Kimberlite No. 1 (AKl) orebody has been carried out using a 40 tonnes per hour pilot plant._x000D_
Pilot plant results, together with laboratory investigations provided a basis for the determination of process design criteria for a major treatment plant. Various sampling programmes were carried out to determine specific aspects in the evaluation of diamond liberation. Treatment parameters such as the top crush size, recrush size and the bottom cut-off size were investigated. A description of the pilot plant is given together with the design criteria for a 3 million tonne per annum treatment plant
Pilot plant results, together with laboratory investigations provided a basis for the determination of process design criteria for a major treatment plant. Various sampling programmes were carried out to determine specific aspects in the evaluation of diamond liberation. Treatment parameters such as the top crush size, recrush size and the bottom cut-off size were investigated. A description of the pilot plant is given together with the design criteria for a 3 million tonne per annum treatment plant
Contributor(s):
P S Plaisted, J F Mack
-
The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design CriteriaPDFThis product is exclusive to Digital library subscription
-
The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design CriteriaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1984
- PDF Size: 0.507 Mb.
- Unique ID: P198403044