Silicon Manufacture in Western Australia Using Local Raw Materials
A 24,300 tonnes per year state of the art Silicon smelter is being constructed for Barrack Silicon Pty Ltd at Kemerton, 20 kilometres north of the City of Bunbury in Western Australia._x000D_
The plant is designed for the reduction of high purity quartzite lump to metallic silicon in two 27MVa Demag submerged arc electric furnaces. The primary reductant, a high purity charcoal, will be manufactured at the plant from locally sourced jarrah wood waste (Eucalyptus Marginata). Commercial silicon production is scheduled to commence in October 1989. Keywords: Silicon, Smelter, Quartzite, Furnace, Charcoal, Jarrah, Wood, Eucalyptus Marginata.
The plant is designed for the reduction of high purity quartzite lump to metallic silicon in two 27MVa Demag submerged arc electric furnaces. The primary reductant, a high purity charcoal, will be manufactured at the plant from locally sourced jarrah wood waste (Eucalyptus Marginata). Commercial silicon production is scheduled to commence in October 1989. Keywords: Silicon, Smelter, Quartzite, Furnace, Charcoal, Jarrah, Wood, Eucalyptus Marginata.
Contributor(s):
D M Spratt, R A Leupen, P A Bibby
-
Silicon Manufacture in Western Australia Using Local Raw MaterialsPDFThis product is exclusive to Digital library subscription
-
Silicon Manufacture in Western Australia Using Local Raw MaterialsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 5.639 Mb.
- Unique ID: P198904027