Conference Proceedings
Annual Conference, South Australia
Conference Proceedings
Annual Conference, South Australia
Molten Salt Process for Debismuthising Lead
The Dittmer process for the debismuthising of lead by electrolysis beneath molten caustic soda has been scaled up to 100 kg lots for batchwise operation and to 20 kg per hour for a continuous flow of lead. Bismuth was decreas- ed from 0.03 to less than 0.005 wt. per cent for an electricity consumption of 220 kWh per ton of lead. Lower bismuth levels may be readily achieved if required.
Contributor(s):
H J Gardner, W T Denholm
-
Molten Salt Process for Debismuthising LeadPDFThis product is exclusive to Digital library subscription
-
Molten Salt Process for Debismuthising LeadPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1975
- PDF Size: 0.103 Mb.
- Unique ID: P197504018