Conference Proceedings
Annual Conference, South Australia
Conference Proceedings
Annual Conference, South Australia
Rock and Pebble Milling at Kambalda Nickel Operations
The reasons for selecting two stage pebble milling in preference to conventional methods of grinding are discussed._x000D_
Commissioning of the first section was completed in October, 1969. Improvements in both the operating and engineering aspects were then incorporated in the section commiss ioned in March, 1971.
Commissioning of the first section was completed in October, 1969. Improvements in both the operating and engineering aspects were then incorporated in the section commiss ioned in March, 1971.
Contributor(s):
D J Head
-
Rock and Pebble Milling at Kambalda Nickel OperationsPDFThis product is exclusive to Digital library subscription
-
Rock and Pebble Milling at Kambalda Nickel OperationsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1975
- PDF Size: 0.542 Mb.
- Unique ID: P197504029