Conference Proceedings
Annual Conference, Southern and Central Queensland
Conference Proceedings
Annual Conference, Southern and Central Queensland
The Flash Smelter at Mount Morgan Limited
Smelting at Mount Morgan started in 1906 with blast furnaces which were replaced by a reverberatory furnace in 1939. The second reverberatory, commissioned in 1944, was replaced by a copper flash smelter in 1972. Flotation concentrates, dried to 0.05 per cent moisture, were oxidised under accurately controlled conditions and produced 45 per cent Cu matte and a slag in the flash smelter. The matte was converted to blister copper and the slag was slowly cooled before grinding and retreatment in a flotation concentrator.
Contributor(s):
K D Cunningham, B D Warner
-
The Flash Smelter at Mount Morgan LimitedPDFThis product is exclusive to Digital library subscription
-
The Flash Smelter at Mount Morgan LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1974
- PDF Size: 0.108 Mb.
- Unique ID: P197404042