Skip to main content
Conference Proceedings

Annual Conference, Townsville

Conference Proceedings

Annual Conference, Townsville

PDF Add to cart

The Establishment and Operation of Queensland Alumina Limited

The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as reductant, copper levels of anode furnace slag were lowered to 1% or less, with batch times of approximately 120 minutes. Fluxing with limestone was required to produce a fluid slag at temperatures of 1200 - 1300C. For converter slags, reduction to 0.5% Cu or less was achieved in batch times of 35 minutes. The chemistry of the pyrometallurg- ical recovery of copper is briefly reviewed in relation.to copper recovery methods.
Return to parent product
  • The Establishment and Operation of Queensland Alumina Limited
    PDF
    This product is exclusive to Digital library subscription
  • The Establishment and Operation of Queensland Alumina Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1978
  • PDF Size: 0.131 Mb.
  • Unique ID: P197804033

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.