Conference Proceedings
Annual Conference, Townsville
Conference Proceedings
Annual Conference, Townsville
The Establishment and Operation of Queensland Alumina Limited
The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as reductant, copper levels of anode furnace slag were lowered to 1% or less, with batch times of approximately 120 minutes. Fluxing with limestone was required to produce a fluid slag at temperatures of 1200 - 1300C. For converter slags, reduction to 0.5% Cu or less was achieved in batch times of 35 minutes. The chemistry of the pyrometallurg- ical recovery of copper is briefly reviewed in relation.to copper recovery methods.
Contributor(s):
B G Hiskens
-
The Establishment and Operation of Queensland Alumina LimitedPDFThis product is exclusive to Digital library subscription
-
The Establishment and Operation of Queensland Alumina LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1978
- PDF Size: 0.131 Mb.
- Unique ID: P197804033