Conference Proceedings
Annual Conference, Western Australia
Conference Proceedings
Annual Conference, Western Australia
Processing of Groote Eylandt Manganese Ores
The manganese ore deposits at Groote Eylandt are quite variable both in regard to grade and physical cond- ition. In order to treat a wider range of these ores and to increase production a new primary-crusher and' concentrator complex costing $8 million has been installed and commissioned to treat ore at the rate of 12,000 tonnes per day. The initial testwork carried out to determine the method of the ore treatment required, and on which the design of the concentrator was based, is detailed. The flowsheet and equipment used is discussed together with the operation of the plant. The production achieved and product qualities obtained are given.
Contributor(s):
G H Matheson, C I K Berglin, R K A Taylor
-
Processing of Groote Eylandt Manganese OresPDFThis product is exclusive to Digital library subscription
-
Processing of Groote Eylandt Manganese OresPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1973
- PDF Size: 0.449 Mb.
- Unique ID: P197305041