Skip to main content
Conference Proceedings

Annual Conference, Western Australia

Conference Proceedings

Annual Conference, Western Australia

PDF Add to cart

Processing of Groote Eylandt Manganese Ores

The manganese ore deposits at Groote Eylandt are quite variable both in regard to grade and physical cond- ition. In order to treat a wider range of these ores and to increase production a new primary-crusher and' concentrator complex costing $8 million has been installed and commissioned to treat ore at the rate of 12,000 tonnes per day. The initial testwork carried out to determine the method of the ore treatment required, and on which the design of the concentrator was based, is detailed. The flowsheet and equipment used is discussed together with the operation of the plant. The production achieved and product qualities obtained are given.
Return to parent product
  • Processing of Groote Eylandt Manganese Ores
    PDF
    This product is exclusive to Digital library subscription
  • Processing of Groote Eylandt Manganese Ores
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1973
  • PDF Size: 0.449 Mb.
  • Unique ID: P197305041

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.