Conference Proceedings
Annual Conference, Western Australia
Conference Proceedings
Annual Conference, Western Australia
The Use of Decline Haulage at Mount Charlotte to Enable Production from Horizons Below the Underground Crusher
The low grade Mount Charlotte orebody was first mined with minimum capital expenditure by mechanised cut and fill stoping. The lower block was prepared simultaneously for open stoping by shaft sinking and installing another crusher and services. Similar development for the third block was discouraged by economic factors and reduced tonnage. Decline develop- ment required less capital and opened up ore reserves commensurate with advance, providing flexibility to stop operations without commit- ment: A 1 in 7 decline measuring 4.25m x 5.5m to accommodate standard Euclid 25 tonne dump trucks was developed south of the orebody. A fleet of four trucks average 12 loads each per shift over a haul distance of 700m.
Contributor(s):
R A Tastula
-
The Use of Decline Haulage at Mount Charlotte to Enable Production from Horizons Below the Underground CrusherPDFThis product is exclusive to Digital library subscription
-
The Use of Decline Haulage at Mount Charlotte to Enable Production from Horizons Below the Underground CrusherPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1973
- PDF Size: 0.238 Mb.
- Unique ID: P197305063