Skip to main content
Conference Proceedings

Apcom '77, Brisbane

Conference Proceedings

Apcom '77, Brisbane

PDF Add to cart

Computerised Geological and Mining Ore Reserve Systems at Western Mining's Kambalda Nickel Operations

Ore reserves at the Kambalda Nickel Operations of Western Mining Corporation are estimated using the polygonal method for calculating areas of influence of drillholes._x000D_
All raw assay and survey data are stored on one disk pack on the Company's CYBER 73 computer located in Perth, about 600 km from Kambalda. The initial step involving the computer is to search all assay data and calculate all potential ore-grade intersections. As the orebodies are thin, structurally complex and many are in close stratigraphic proximity, the selection of intersections which have the best grade over at least a minimum mining width involves complex logic. The orientation of an ore surface at each drill intersection point and a zone code are added to each intersection by the geologist from geological plans prepared for each ore surface. The orientation data together with downhole surveys enables the calculation of inter- section true widths and the zone code links each recalculated intersection to the appropriate ore surface.
Return to parent product
  • Computerised Geological and Mining Ore Reserve Systems at Western Mining's Kambalda Nickel Operations
    PDF
    This product is exclusive to Digital library subscription
  • Computerised Geological and Mining Ore Reserve Systems at Western Mining's Kambalda Nickel Operations
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1977
  • PDF Size: 0.219 Mb.
  • Unique ID: P197701022

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.