Skip to main content
Conference Proceedings

Apcom '77, Brisbane

Conference Proceedings

Apcom '77, Brisbane

PDF Add to cart

Optimizing the Short Term Production Schedule for an Open Pit iron Ore Mining Operation

The model described in this paper has been developed for and in close collaboration with the Bong Mining Company Ltd, Liberia/West Africa. When working an irregular deposit a de- tailed short term production schedule becomes necessary in order to ensure an equal and homo- genous concentrator feed. If the irregularity of the ore body exceeds a certain degree, blen- ding facilities have to be provided between the mine and the concentrator, but even then sche- duling of the mine production is inevitable to meet the given requirements of the blending bed and to keep these conditions steady for at least some of the successive periods. To assist the planning department in set- ting up optimal production schedules a computer model has been developed using a linear pro- gramming approach. The deposit is divided into equally shaped blocks containing defined quali- ties and quantities of ore and/or waste; from which one has to select those quantities of ore which will meet the requirements of the blen- ding bed. The objective function of the model
Return to parent product
  • Optimizing the Short Term Production Schedule for an Open Pit iron Ore Mining Operation
    PDF
    This product is exclusive to Digital library subscription
  • Optimizing the Short Term Production Schedule for an Open Pit iron Ore Mining Operation
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1977
  • PDF Size: 0.154 Mb.
  • Unique ID: P197701038

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.