Skip to main content
Conference Proceedings

AusIMM Annual Conference, Perth, WA, August 1964

Conference Proceedings

AusIMM Annual Conference, Perth, WA, August 1964

PDF Add to cart

Hydraulic Stope Filling on the Golden Mile

Cut and fillstoping using hydraulically placed mill tailings has become an essential feature of stoping operations in Kalgoorlie. ' Approximately 30 per cent of the total production is currently mined by this method._x000D_
Fill is prepared by thickening or cycloning and is gravitated or pumped underground. The average pulp density is 70 per cent solids by weight, Recent cost reducing innovations are the use of steel passes, corrugated iron manways, polythene film sealing, and the replacing of vertical cement lined pipes with boreholes. TTTTTI rvr T Trim r l1TT
Return to parent product
  • Hydraulic Stope Filling on the Golden Mile
    PDF
    This product is exclusive to Digital library subscription
  • Hydraulic Stope Filling on the Golden Mile
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1963
  • PDF Size: 0.591 Mb.
  • Unique ID: P196401011

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.