Skip to main content
Conference Proceedings

AusRock 2014: Third Australasian Ground Control in Mining Conference

Conference Proceedings

AusRock 2014: Third Australasian Ground Control in Mining Conference

PDF Add to cart

Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold Project

Remnant rib pillars at Castlemaine Goldfields Ltd's Ballarat Gold Project have been sterilised by the placement of loose rock fill in production stopes. The application of selectively injecting low-viscosity grout into the backfilled stopes to form a stabilised material has enabled recovery of the previously sterilised pillars. This paper outlines the engineering design, quality control and quality assurance program implemented to ensure the safe and efficient recovery of the rib pillars. The successful program included laboratory testing, numerical exposure stability modelling and in situ monitoring.CITATION:Sainsbury, B L, Sainsbury, D P, Western, J, Petrie, P E and Mutton, V, 2014. Pillar recovery adjacent to stabilised rock fill at the Ballarat Gold Project, in Proceedings AusRock 2014: Third Australasian Ground Control in Mining Conference , pp 77-86 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold Project
    PDF
    This product is exclusive to Digital library subscription
  • Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2014
  • PDF Size: 11.734 Mb.
  • Unique ID: P201412009

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.