Conference Proceedings
Australian Mine Ventilation Conference 2015
Conference Proceedings
Australian Mine Ventilation Conference 2015
Publication sale now on, get up to 70% off
Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri Mine
Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action response plans (TARPs) are established at the start of longwall mining and often are only reviewed when triggers are activated frequently and become nuisance alarms', or in the worst case scenario after a heating event. Narrabri Mine has adopted a proactive approach of reviewing the longwall active goaf spontaneous combustion monitoring TARP at the commencement of each longwall block and prior to reaching a known mylonite zone' of crushed coal, which is associated with increased coal oxidation. The review is based on information recorded from the monitoring data of the previous longwall blocks as well as interpretation of relevant spontaneous combustion propensity results for the coal. This has resulted in the mine implementing a zoned TARP approach for each longwall block covering both the longwall retreat through normal undisturbed coal and the zone where the goaf is influenced by the increased coal oxidation associated with the mylonite coal. The consequence of this approach is that it has removed the issue of having nuisance triggers being activated during mining through a known increased oxidation zone, while maintaining a high awareness of indicators of spontaneous combustion.CITATION:Baxter, H, Claassen, C, Salisbury, O, Brady, M and Beamish, B, 2015. Implementation of a zoned trigger action response plan associated with changing mine conditions at Narrabri Mine, in Proceedings The Australian Mine Ventilation Conference, pp 113-120 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
H Baxter, C Claassen, O Salisbury, M Brady, B Beamish
-
Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri MinePDFThis product is exclusive to Digital library subscription
-
Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2014
- PDF Size: 0.544 Mb.
- Unique ID: P201508013