Skip to main content
Conference Proceedings

Australian Mine Ventilation Conference 2022

Conference Proceedings

Australian Mine Ventilation Conference 2022

PDF Add to cart

Simulation study on crucial parameters of long-compressive and shortsuction ventilation in large section roadway excavation of LongWangGou coalmine

LongWangGou coalmine auxiliary inclined shaft heading face has a large section, fast heading speed, and large dust production. The problems of high concentration and wide distribution of dust in the roadway air are very prominent. To improve the efficiency of roadway ventilation and dustremoval, long-compression and short-suction (after this referred to as LCSS) are adopted. The dust concentration and airflow field distribution in the roadway are numerically simulated by FLUENT. The change of the position between the pressure duct and the exhaust duct and the different pressure-extraction ratios affect the distribution of airflow velocity, the formation of vortex zone, and the distribution of dust concentration in the roadway. When Ly = 25 m, Lc = 5.0 m, W = 1.2, a wind curtain is formed at 5 m in front of the heading face to prevent dust from spreading deeper into the roadway.
Return to parent product
  • Simulation study on crucial parameters of long-compressive and shortsuction ventilation in large section roadway excavation of LongWangGou coalmine
    PDF
    This product is exclusive to Digital library subscription
  • Simulation study on crucial parameters of long-compressive and shortsuction ventilation in large section roadway excavation of LongWangGou coalmine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2022
  • Pages: 26
  • PDF Size: 11.624 Mb.
  • Unique ID: P-02692-S5V2P1

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.